Projects
Republic of Uzbekistan:
Our realized projects:
Thermal Power Plants (TPP) of condensation-type:
Talimarjan TPP
fuel – gas (prime and backup fuel)
|
 |
In November of 2004the Block number 1 with a capacity of 800mW was put into operation.
|
Sirdaya TPP
fuel – gas , furnace oil
|
 |
From 1971 to 1981
10 x 300 mW.
In total 3000 mW.
|
New-Angren TPP
The Block number 1-5, fuel -- coal
The Block number 6-7, fuel - gas , furnace oil
|
 |
From 1980 to 1985
7 x 300 mW. In total 2100 mW.
|
Tashkent TPP
fuel - gas , furnace oil
|
 |
From 1963 to 1971
12 x 160 mW. In total 1920mW
|
Navoi TPP
fuel - gas , gas
|
 |
From 1960 to 1979. 2 x R-50 mW, 2 x 200 mW, 1 x PT–60 mW, 4 x K-160 mW.
1250 mW – fixedcapacity.
|
Angren TPP
fuel -- coal
|
 |
1955 – 1960. 4 x 150 mW, 4 x 100 mW. In total 1000 mW.
|
Tahiataj TPP
fuel - gas , gas
|
 |
1968 – 1973 3 x 100 mW and 2 x 200 mW. In total 700 mW.
|
Solar-fuel TPP
|
 |
330 mW. (TEA)
|