Projects

Republic of Uzbekistan:

Our realized projects:

Thermal Power Plants (TPP) of condensation-type:

Talimarjan TPP      

fuel – gas (prime and  backup fuel)

 

In November of 2004the  Block number 1 with a capacity of  800mW was put into operation.

Sirdaya TPP     

fuel – gas , furnace  oil

 

From 1971  to 1981

10 x 300 mW.                            

In total 3000 mW.

New-Angren TPP

The  Block number 1-5, fuel -- coal                    

The  Block  number 6-7,  fuel  - gas , furnace  oil

 

From  1980  to 1985

7 x 300 mW. In total 2100 mW.

Tashkent TPP

fuel  - gas , furnace  oil

 

From 1963  to  1971

12 x 160 mW. In total 1920mW

Navoi TPP                       

fuel  - gas , gas

 Навоийская ТЭС

From  1960 to  1979. 2 x R-50 mW, 2 x 200 mW, 1 x PT–60 mW, 4 x K-160 mW.

1250 mW – fixedcapacity.

Angren TPP

fuel -- coal                     

 Ангенская ТЭС

1955 – 1960. 4 x 150 mW, 4 x 100 mW. In total 1000 mW.

Tahiataj TPP

fuel  - gas , gas

 

1968 – 1973 3 x 100 mW and 2 x 200 mW. In total 700 mW.

Solar-fuel TPP

 

330 mW. (TEA)